Monday, August 18, 2014

Community Picnic - September 7th


It's really exciting when we walk around the neighbourhood and people start asking when the community picnic is going to be? So we picked a day -
When: Sept 7th
Starting: at 1:00 pm.
Where: our little park

We'll make it a picnic. Bring a blanket and a picnic lunch for the family and an extra dish to share.

If you have a folding table, bring it along. We'll set them up with the food.
We'll set up a Bocce Ball tournament.
If someone with children has some ideas for kids, please make suggestions.
Anything else, please make suggestions.

On the day of the picnic, we'll have stick-on nametags so we can get to know each other.

Of course everything is weather dependent.

Tuesday, August 5, 2014

Redevelopment Proposed for 60-Acre Celestica Site in Don Mills

reposted from http://urbantoronto.ca/news/2014/08/redevelopment-proposed-60-acre-celestica-site-don-mills

The largest redevelopment proposal triggered to date by the construction of the Crosstown LRT has been received by the City of Toronto. Electronics manufacturer Celestica International Inc. is looking to amend the Official Plan for its 24 hectare/60 acre headquarters property at Don Mills Road and Eglinton Avenue East to allow for the redevelopment of the under-utilized land; the company's low-rise buildings only occupy 27% of the property while much of the rest is currently used as surface parking lots. With an underground LRT station opening here in 2020, market forces will undoubtedly drive up the value of the land, potentially making the low density use of it financially unsustainable and undesirable from a broader planning perspective.


The proposed redesign of the area would transform the plot into two zones that would include residential units, office space and retail space. The final product would be based on seven development blocks served by new public streets and open space. The property at the northwest corner of Don Mills and Eglinton is bordered on the northwest by Canadian Pacific Railway tracks.

During its December 2013 meeting, City Council considered a request to convert the Celestica headquarters, which were originally designated as employment lands, for non-employment purposes. The City decided to designate them as General Employment Areas instead, zoning which permits places for business and economic activities generally located on the peripheries of employment areas, and which also permits retail and service uses such as restaurants, fitness centres and ice arenas. This zoning does not include residential uses.

This new application hopes to amend the status of the land as employment areas, splitting it into a general employment area and mixed use areas, which would allow a substantial amount of residential housing. The area of the plot located to the far southwest, designated as Natural Area, has had no amendments proposed.

If this amendment is approved the residential conversion proposal would accommodate 2,897 dwelling units, 77,136 m2 of office space, and 9,105 m2 of retail space. In this plan Wynford Drive is proposed to be extended westward and southward through the site to connect to an existing interchange at Eglinton Avenue. A new public street would begin at the existing right-in-right-out driveway from Eglinton Avenue and extends northward beyond the proposed Wynford Drive extension, turning eastwards to another right-in-right-out outlet at Don Mills Road. This street would divide the mixed use portion of the west and central areas from the employment uses on the east side of the site. A second new public street would run east-west through the central portion of the site and provide access to the residential, retail and office spaces.

The conceptual site plan of the mixed use areas includes eight high-rise buildings, ranging from 24 to 40 storeys, stacked townhouses, convenience retail, open spaces, and community uses. A hockey arena along with below-grade and at-grade parking to accommodate approximately 930 vehicles has also been proposed. The general employment area uses include two retail buildings and two office buildings ranging in height from two to eight storeys. Celestica does intend to lease back office space for headquarters use and potentially some research facilities as well.

The existing buildings, which contain 113,248 m2 of office and manufacturing space, are proposed to be demolished. However, there is a chance that portions may be retained for posterity's sake; a Heritage Impact Assessment was completed for the 844 Don Mills Road headquarters, a former IBM plant. ERA Architects, who prepared the assessment, indicated that the building's the primary facades and landscape elements could be recommended for restoration where opportunities exist to to re-integrate original features. The former IBM plant is listed on the City of Toronto's Inventory of Heritage Properties.

Properties on the other three corners of the Don Mills and Eglinton intersection are City holdings and have recently been turned over to Build Toronto for redevelopment, while the Crosstown LRT station will impact them. The main entrance for the station is currently planned for the southwest corner, closest to the Ontario Science Centre to the south. A secondary entrance with bus platforms are planned for the northeast corner. The southeast corner is currently a parking lot.

The City's greatest concern with the proposal is that such a large amount of space would be removed from the city's inventory of lands designated for employment, while many other issues must also be assessed. They include the proposal's conformity to applicable provincial legislation, traffic impacts on the existing road network and intersections, conservation of the heritage resources at the site, and the general viability of a new community in this area. We will keep you updated on how the City responds to this proposal and what that will mean for the Don Mills and Eglinton intersection and surroundings.

Sunday, July 20, 2014

Another great reason to live in Don Mills and not Leaside


I know this is a quick jab to the ever popular Leaside neighbourhood, but when you read the exciting news about what's happening with the crosstown LRT, you'll understand why we're much luckier. We will get all the benefits with very little pain.

To quote the local news: the Elington Crosstown is the cornerstone of the Toronto LRT projects. Starting at Mount Denis in the west and traveling underground from Black Creek Drive to Laird Avenue, the new LRT train will link to 54 bus routes, 3 TTC interchange subway stations and GO Transit.


This is where we get off so much better than our neighbours in Leaside. Don Mills residents can avoid much of the construction pain by staying away from Eglinton.


The big dig has begun. Commuters can expect a traffic nightmare for a while. Daily lane restrictions on Eglinton between Leslie and Laird have already begun as crews clear utility lines and trees in an area on the south side of Eglinton to make way for a massive excavation shaft.

Parts for the next two tunnel-boring machines - nicknamed Don and Humber - will arrive this summer and be assembled in the shaft before they start drilling the 3.25 km section heading west to Yonge St.

Many will have already experienced the lane reductions as traffic squeezes from 3 lanes each way, into 1 lane in each direction. In a couple of weeks, traffic will also be tied up around Laird as Metrolinx begins building the below ground walls that will form the ends of the subway station there. Work will continue on the station for 6 to 8 months. And it will take 2 years to build an emergency exit for the line close to Leaside High School.

For all the latest information check out the website http://www.thecrosstown.ca

Sunday, June 29, 2014

Plans to extend our piece of natural paradise in the heart of Don Mills

Exciting news about the natural woodland in our neighborhood - The city is planning to extend the trail system through the Charles Sauriol Conservation Reserve all the way to Wilket Creek Park and then down to the waterfront.

Part of the city’s ten year capital works project is to develop a network of off-road paved trails throughout the city including a trail that will link the Charles Sauriol Conservation Reserve to the network of trails running south to the lakeshore and east from the Forks of the Don at Don Mills Road and the DVP, and will also link to interregional trails east of Toronto.

The plans are in place and the money ear-marked for the project. Completion is planned for 2019.

The Charles Sauriol Conservation Reserve is really like a private reserve just for our neighborhood. It’s an amazing space that can only be accessed via the park that lies south of Lawrence Avenue just east of the DVP or via Moccasin Trail Park. As you walk under the ‘rainbow bridge’ – visible to anyone who’s driven up the DVP just north of Wynford Drive – and wonder across the bridge you will find the main trail. If you turn left you’re heading north and will ultimately run into the Milne House – an abandoned, historic Gothic Revival farmhouse at the north end of the reserve.
On the way you’ll pass by one of the City’s Bird Flyways sites, a project created to enhance bird habitat along migratory corridors, and a small pond that is home to raccoons, beavers, mink, rabbit, fox, blue herons, turtles, salmon, deer, and a myriad of other native wildlife.

If, instead, you have turned right and head south you would follow the river through natural wetlands, past river views, under train trestles and around woodland until you wind up at the Wynford-Concorde neighborhood. There is a challenging trail here that will lead you up to the Tim Hortons at Wynford Drive and Concord Place.

Tuesday, June 17, 2014

Stop aggressive driving - you have the power


This is personal (I almost got hit backing out of my driveway this morning) but I have heard many other neighbours issuing the same complaint - there are too many aggressive drivers in our little neighbourhood.

You have the power to stop it!

We are a small neighbourhood, the posted speed is 40 km/hr. We, the community, asked for that. There are many children playing in the park and out and about on the roads and sidewalks. Lots of people walk around the neighbourhood, with and without dogs. It's what makes our neighbourhood great. We are also densly populated and need to make accommodation for each other. Running stop signs, whipping around corners, or just being a little too pushy are all asking for trouble.

Take the time to allow your neighbour to back out of a driveway. Tight parking situations mean that people are manouvering around tight corners and dealing with blind spots. Remember that the next time you see someone inching their way into traffic.

What to do if you spot aggressive driving

If you spot aggressive driving, the Toronto Police Service does have a way of reporting it. Go to https://webapp1.torontopolice.on.ca/dors/hit-run.html and follow the steps.

To report illegal parking, call 416-808-2222 (24 hours-a-day, 7 days-a-week).

Thursday, May 22, 2014

What's going on with area developments?

Just a quick update. There are two active development areas in our little neighbourhood: Green Belt Drive and Nob Lane and the Ghod's development on David Dunlap Circle. Everything is quiet right now but there have been small developments.

Ghod's development did take their plans to the OMB on May 20th. The OMB decided to postpone the hearing until the autumn to allow the city to prepare its case. Ghod's has proposed a townhouse development that the city feels is too densely populated and has proposed fewer homes.

As for the second proposed development at Nob Lane and Green Belt Drive, the city has hosted two working group sessions with representatives from the neighbourhood and the developer. After consultation, the developer appears to be modifying his plans to accommodate neighbourhood concerns but to date no official proposal has been presented to the city. Until something is officially introduced, everything is hearsay.

That's it for now. The current municipal elections mean that nothing will be done until city council reconvenes after the election.

Monday, May 12, 2014

Summer is not so far away


Summer is just around the corner and I, for one, can't wait to spend lazy hours sitting in my back garden sipping some wine and chatting with friends.

I've been getting a lot of lovely comments on my backyard (from an earlier post called Small Space Oasis). Although I would love to accept all the compliments, I feel it's only fair to point out that one of the four photos in the earlier post was my backyard, but the rest are other neighbour's.


Our backyard is our sanctuary. We had a patio installed with a hard top gazebo. Along the back wall we put up a privacy fence which allows for a clematis to grow. On the wall beside the door we've put up a fountain which really does limit the amount of noise from the Don Valley. Every year we do something a little different. Drop around sometime to say hi.

The patio was installed by:
Landscaper/patio stones/drivesways
Neale Nicholes
C: 416-886-2578
W: 416-688-2578
Neale also errected the gazebo.

The second backyard is from neighbours Sid and Chris on Green Belt Drive. They also have a hard top gazebo on a cement patio with oodles of flowering plants.









The third patio is Kim Fraser's from Humphrey Gate. Now instead of a large patio, Kim has chosen to create a shaded retreat surrounded by annual plantings of hostas and trees. The perfect place for two to toast the setting summer sun.


There are many more gardens in our little part of Don Mills, post your pictures and share your private space.